Every machine, with its whole life story on one QR tag.
Scan the tag on a gearbox and see its make, location, drawings, manuals, criticality, spares list and every job ever done on it. No hunting through cupboards or old registers at 3 AM.
QR tag
Opens the asset on any phone
Criticality
A, B or C per machine
GB-3
Helical, ratio 12.5:1 · installed 2017
Drawings
6
Manuals
3
History
41
Last overhaul14 Mar 2025
OilISO VG 320, 38 L
Bearings6312, 22216 E
History
Every job, reading and part
QR tag
Opens the asset on any phone
Criticality
A, B or C per machine
History
Every job, reading and part
What it does
Machine Registry, part by part
Every machine with location, make, drawings, manuals, criticality and full maintenance history, opened by scanning the QR tag on the machine.
Asset hierarchy
Plant, area, line, machine and component, so a bearing belongs to a gearbox that belongs to Line 3.
Drawings and manuals
Attach PDFs, exploded views, wiring diagrams and OEM manuals to the exact asset they describe.
Criticality ranking
Rate each machine A, B or C by safety, quality and production impact. Alarms and jobs follow that priority.
Bill of materials
List the bearings, seals, belts and filters each machine uses, linked to live stock in Spares Crib.
Full maintenance history
Breakdowns, PMs, readings, photos and costs on one timeline per asset.
Excel import
Bring your existing asset register in from a spreadsheet in an afternoon, then print QR tags.
Sequence of operation
How it runs in your plant
- 1
Import
Upload your asset list from Excel or start from our templates for motors, pumps, compressors and gearboxes.
- 2
Tag
Print weatherproof QR labels and fix them to each machine.
- 3
Attach
Add drawings, manuals, nameplate photos and the spares list.
- 4
Use
Technicians scan to view history, raise a job or log a reading.
Spec sheet
- Asset levels
- Up to 6 (plant to component)
- Attachments
- PDF, DWG, images, video up to 200 MB each
- Custom fields
- Unlimited per asset class
- QR labels
- Printable on A4 sheets or label printers
- Import formats
- XLSX, CSV
Connected parts
Hang a tag on your first 5 machines.
- Machines
- 5
- Days free
- 60
- Card needed
- No
Signed: maintenance head, ____________
Control station
- Start with sensors we rent you, or with PLC data you already have
- Asset register, work orders and PM live in the first week
- Your first AI baseline is ready after about 14 days of readings