From warning to signed-off job, on the technician's phone.
Breakdown and planned jobs are assigned to technicians with the checklist, the lockout steps, the spares and the asset history. Photos, time and sign-off come back from the floor without a paper form.
Checklist
Step by step, set by the plant
LOTO
Isolation steps before work
Replace bearing 6312, GB-3
In progressPlanned · Sun 06:00 · R. Patil, S. Khan
- Isolate M-3 at MCC panel 4, lock and tag
- Verify zero energy, try start at local station
- Remove coupling guard and drain oil to 20 L mark
- Pull bearing 6312, fit new, check end-float 0.05-0.10 mm
- Refill ISO VG 320, remove locks, trial run 30 min
Photos
Spares6312 x1 issued
Time1 h 52 m
Sign-offShift engineer
Sign-off
Supervisor approval on phone
Checklist
Step by step, set by the plant
LOTO
Isolation steps before work
Sign-off
Supervisor approval on phone
What it does
Work Orders, part by part
Breakdown and planned jobs on technicians' phones, with checklists, lockout-tagout steps, photos and supervisor sign-off.
Raise from anywhere
From an AI prediction, a sensor alarm, a PM schedule, or a technician scanning a QR tag.
Lockout-tagout steps
Isolation, verification and restoration steps set by the plant, required before the job can close.
Checklists and readings
Torque values, clearances and oil levels captured as numbers, not ticks.
Photos and notes
Before and after photos attached to the job and the asset history.
Spares booked
Parts reserved in Spares Crib are issued to the job, so the cost lands on the right machine.
Offline mode
Jobs, checklists and photos work without signal and sync when back in range.
Sequence of operation
How it runs in your plant
- 1
Raise
A job is created with priority from the machine's criticality.
- 2
Assign
The planner assigns technicians and a time slot.
- 3
Work
Technicians follow the LOTO steps and checklist on their phone.
- 4
Close
Photos, time and spares are logged and a supervisor signs off.
Spec sheet
- Job types
- Breakdown, planned, PM, inspection, project
- App
- Android and iOS, works offline
- Languages
- English, Hindi, Marathi, Tamil, Telugu, Kannada, Gujarati
- Approvals
- Multi-level sign-off by role
- Notifications
- Push, email and WhatsApp
Safety and responsible AI
- Work orders include lockout-tagout and safety checklists set by the plant. Safety rules remain the plant's responsibility.
- AI-raised jobs are suggestions until an engineer approves them.
- Schafte never starts, stops or controls machines. It only reads data.
Connected parts
Hang a tag on your first 5 machines.
- Machines
- 5
- Days free
- 60
- Card needed
- No
Signed: maintenance head, ____________
Control station
- Start with sensors we rent you, or with PLC data you already have
- Asset register, work orders and PM live in the first week
- Your first AI baseline is ready after about 14 days of readings